Lorem ipsum dolor sit amet, consectetur adipisicing elit, sed do eiusmod tempor incididunt et.
Located on the University of Washington Campus this project consists of a dark split face Basalt stone on the interior and exterior of the facade. There are large stone sills and stone gutters that drain runoff water into a bio retention planter along the front of the building.