Lorem ipsum dolor sit amet, consectetur adipisicing elit, sed do eiusmod tempor incididunt et.
Build in 2006 and 2007, Providence’s North Pavilion 9-story tower’s principal exterior façade incorporated 290,000 brick into its exterior skin. Highly visible while driving west on the Banfield freeway, the North Pavilion also had 13,000 block and several hundred lineal feet of precast concrete bench were all furnished & installed by J&S Masonry.
Portland, OR
Zimmer Gunsul Frasca Architects, LLP
Turner Construction
4805 NE Glisan St, Portland, OR 97213