Lorem ipsum dolor sit amet, consectetur adipisicing elit, sed do eiusmod tempor incididunt et.
Located in the West End Downtown district in Portland, the Moxy Hotel was completed in 2020. J&S laid 240,000 brick from two different manufacturers to get the perfect blend for the project. Furthermore, Howard S. Wright hired J&S to fully scaffold the exterior facade with their hydraulic mast climbing Fraco.